Dixie County Planning & Zoning

Pineland Engineering prepares permit-ready construction documents for Dixie County, Florida projects and coordinates directly with the Dixie County Planning & Zoning during plan review — so you get your permit faster.

Quick Answer

For a building permit in unincorporated Dixie County, use Online Applications on the county’s Building & Zoning page. To schedule an inspection on an existing permit, choose Request Inspection on that same page. In Horseshoe Beach, start at Town Hall for a dock, addition or other project on the town’s list.

The Dixie County Building & Zoning permit counter is at 387 SE 22 Ave, Cross City, FL 32628. Call the office at 352.498.1235 or the Permit Technician at 352.498.1236. For a trip to the counter, plan around the lunch break. Staff hours are Monday through Friday, 8:00 a.m. to noon and 1:00 to 5:00 p.m. The mailing address is PO Box 2600, Cross City, FL 32628. Office details and county links checked November 23, 2026.

Where Can I Verify the Official Requirements?

Check town limits before drawing the site plan

A Cross City mailing address alone does not tell you which paperwork to gather.

For land inside city limits, the county residential checklist calls for city approval paperwork. If the lot is in the Town of Cross City, call the town at (352) 498-3306 and describe the proposed work. For a Horseshoe Beach address, call Town Hall at 352-498-5234. Its list includes storage buildings, grading and additions as well as waterfront work.

For unincorporated land, open the Zoning Atlas from the county building page and locate the parcel.

Section 4.1.2 of the county Land Development Regulations identifies the atlas used for zoning districts. Take the district and a sketch of the proposed footprint to county zoning staff. Ask whether that use fits the district and how far the structure must sit from each property line before paying for a finished site plan.

Sources: [1] Dixie County Building & Zoning | Office, applications and inspections; [2] Dixie County residential worksheet and checklist; [5] Horseshoe Beach Town Hall permit instructions; [6] Town of Cross City contact information; [7] Dixie County Land Development Regulations

Prepare the residential application in Cross City

Use Dixie County’s Online Applications to file online.

For a house or addition, open the Residential Application worksheet to gather the details before filing. Enter the job-site address, parcel ID and zoning, describe the work, and enter its area and cost. Bring the deed or contract for deed. If someone other than the owner or contractor will apply, the county asks for a notarized letter authorizing that person to pull the permit.

For a new home, work through the checklist on the next page. Alongside the signed application it lists a signed survey, a site plan drawn to scale and a septic tank permit or sewer company letter.

Check the truss engineering, product approval paperwork and energy calculations against the house you plan to build. The county lists Manuals J, S and D with the energy documents. For an addition, ask the Permit Technician which of those items apply to the rooms and systems you are changing.

The county says it will neither process an incomplete residential application nor hold the paperwork at the office.

If you file at the counter, its checklist suggests bringing digital copies on a thumb drive. Keep driveway approval on the project list through construction. Dixie County asks for it before final power release.

Sources: [2] Dixie County residential worksheet and checklist; [1] Dixie County Building & Zoning | Office, applications and inspections

Use the marine worksheet for a dock, boathouse or seawall

The Marine Application asks for a different site drawing. On a canal, show its width, how much of that width the proposed structure occupies as a percentage, and the setbacks from property lines.

The county calls for a signed plan drawn to scale. The worksheet has a place for the water management permit or exemption number, and the checklist names a water management permit or Florida Department of Environmental Protection exemption.

Inside Horseshoe Beach, the county marine checklist also calls for town compliance paperwork.

For a floating or attached dock, describe it to Town Hall first. The town explains which document to take to the county and directs owners to call the county building department to schedule a review with the town’s land development regulations administrator. Have the canal measurements ready for that conversation.

Sources: [4] Dixie County marine worksheet and site plan checklist; [5] Horseshoe Beach Town Hall permit instructions

Check the flood panel and code edition before ordering plans

FEMA’s map history lists January 18, 2019 as a flood insurance rate map revision for unincorporated Dixie County, Cross City and Horseshoe Beach.

Open FEMA Flood Map Search from the county building page and look up the proposed building location. If the zone boundary crosses the lot, mark the footprint on the survey so county zoning staff can see exactly where you intend to build. That office administers the county flood ordinance. Ask which elevation information belongs on the drawings for that location.

The residential checklist still displays an older code edition.

For a Dixie County application filed now, use the Florida Building Code 8th Edition (2023), effective December 31, 2023. For a house still in design, check the intended filing date against the December 31, 2026 effective date of the 9th Edition (2026). Dixie County lies outside the High-Velocity Hurricane Zone, which is limited to Miami-Dade and Broward. Confirm the design wind criteria for your building site before using a wind figure from the worksheet to order trusses.

Sources: [2] Dixie County residential worksheet and checklist; [1] Dixie County Building & Zoning | Office, applications and inspections; [8] FEMA flood insurance study and map history for Dixie County; [9] Florida Building Commission | Current code; [10] Florida Building Commission | Next code effective date; [11] Florida Building Commission record on hurricane zones

Track the master permit, trade permits and inspections

Dixie County’s permit staff check contractor credentials and permit history at intake.

Plans examiners review the drawings and supporting documents. For a trade contractor joining a job, use Sub Contractors Application on the county page. It asks for the master permit number, job cost and an email address for the payment link. On electrical work it also asks which power company to notify.

When a stage of work is ready, use Request Inspection on the county building page.

Have the master number and the relevant trade permit handy so you can identify the work to be inspected. If your project requires a Notice of Commencement, the Dixie residential worksheet directs you to record the notice and post it at the site ahead of the first inspection. The blank notice is available alongside the county applications.

Sources: [1] Dixie County Building & Zoning | Office, applications and inspections; [3] Dixie County subcontractor application; [2] Dixie County residential worksheet and checklist

Drawings for a Dixie County barn conversion

For a barn or utility building being converted to living space, Dixie County’s residential checklist asks for engineering that identifies residential use and a wall section showing the construction and moisture barriers.

Pineland Engineering can use your survey, building dimensions and proposed room layout to prepare those drawings. Tell the designer which walls you plan to keep so the section shows how those walls will be adapted for the new use.

Sources: [2] Dixie County residential worksheet and checklist

What Do People Ask About Dixie County Planning & Zoning?

What does a Dixie County building permit cost?

Call the Permit Technician at 352.498.1236 with the permit type, square footage and job cost from the county worksheet. Ask for the current fee for that scope and whether any trade applications are billed separately. If the parcel also needs a zoning variance, ask for that fee separately. Section 1.7.1 of the county Land Development Regulations provides for zoning and variance fees set by County Commission resolution.

How long does Dixie County take to review a house permit?

Ask the Permit Technician for the current queue and whether the county has accepted the packet as complete. For example, Florida Statutes § 553.792 gives a local government reviewer 30 business days for a decision on a complete and sufficient application for a new single-family home under 7,500 square feet, unless the applicant waives the timeframe in writing. A decision can be an approval, conditional approval or denial.

What size shed can I build in Dixie County without a building permit?

The county worksheet lists sheds together with carports and pole barns. It gives no floor-area cutoff for an exemption. Before ordering a shed, give Building & Zoning its dimensions, intended use and parcel location. If it will be in Horseshoe Beach, storage buildings are on the town’s list of projects to discuss with Town Hall first.

Can minor work on a Dixie County home qualify for a permit exemption?

Florida Statutes § 553.79(1)(g) provides a limited exemption for a single-family homeowner or their contractor for work valued below $7,500. It excludes electrical, plumbing, structural, mechanical and gas work, and properties lying even partly in a flood hazard area. Check the Dixie parcel’s flood map and submit a written exemption request with the contract or other evidence of the scope and value. A project cannot be split to qualify.

How do I look up a Dixie County permit or get a copy?

For a status update, call the Dixie Permit Technician with the master permit number if available. For a copy of an older permit or inspection record, use the Dixie County Public Records Request form. Specify the parcel, street address, approximate year and which document you need so staff can narrow the search.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.