Quick Answer
A Pensacola mailing address can fall on either side of the city boundary. Look up the site address with the Escambia County Property Appraiser. If the Taxing Authority reads “Pensacola City Limits,” file with City of Pensacola Building Inspections. For a county filing on Pensacola Beach, attach Santa Rosa Island Authority approval. For a Century parcel, attach town approval.
Escambia County Building Services handles permits and inspections for unincorporated Escambia County and the Town of Century. Call the main permit office at 850-595-3550, visit 3363 West Park Place, Pensacola, FL 32505, or select Florida and Escambia County in MGO Connect to apply online.
Where Can I Verify the Official Requirements?
- Contact Escambia County Building Services
- Open MGO Connect to apply or search for a permit
- Check county permit requirements by type of work
- Find the county permit counters
- Look up an address or parcel with the Escambia County Property Appraiser
- Check City of Pensacola jurisdiction and owner-builder instructions
- Select Escambia County in MGO Connect
- Download the Escambia County building permit application and checklist
- Request a building or trade fee estimate
- Building Permit Fee Estimate form
- Escambia County Building Guide
- Development Review Committee filing deadline and appointments
- Florida Statutes § 553.792 — building permit decisions
- Look up the county flood map and reach floodplain staff
- Escambia County Land Development Code
- Community Rating System in Escambia County
- Florida Building Commission materials on the hurricane zone boundary
- Florida Building Commission — current code
- Florida Building Commission — next code effective date
- Request an Escambia County inspection
- Escambia County Building Services questions and answers
- Land Use Certificate for Fence Installation and site plan
- County Planning and Zoning fee schedule
- MyGovernmentOnline customer guide — search by address
- County instructions for contractors and owner-builders filing storm repairs
Which permit counter serves your address?
The West Park Place counter is in the Central Office Complex.
The North Office is at 3470 Highway 29, Cantonment, FL 32533. Call 850-587-5770 for the North Office or email [email protected] for county permitting help. Contact details checked November 23, 2026. Call the office you plan to visit for that day’s counter hours.
For a difficult address, try the Property Appraiser’s “Like” search with just the house number and street name.
Copy the parcel number from the matching property record to the building permit application. Check the county or city box on the application.
Sources: [1] Contact Escambia County Building Services; [4] Find the county permit counters; [3] Check county permit requirements by type of work; [5] Look up an address or parcel with the Escambia County Property Appraiser; [6] Check City of Pensacola jurisdiction and owner-builder instructions; [8] Download the Escambia County building permit application and checklist; [25] County instructions for contractors and owner-builders filing storm repairs
What to file in MGO Connect
At mgoconnect.org, choose Florida, select Escambia County, and sign in or create an account.
Choose the permit application for the work you intend to do. For example, Escambia lists replacing a water heater under plumbing, and replacing exterior doors or windows under building permits. A room addition to a single-family home belongs on the residential permit list. If a contractor files, the county needs the completed application with the contractor’s notarized signature before assigning a permit number. Enter the site and scope in MGO, upload the requested plans and attachments, and submit the application to the county. Use the same account to check its status or respond to a returned application.
For a new home, use the plot plan to show the lot dimensions, the existing buildings, the proposed home and its distances from the lot lines.
Escambia’s new-construction checklist also asks for the wind design method, utility connection locations and energy efficiency forms. For windows, exterior doors, shutters and roof coverings, record the manufacturer, model and complete Florida Product Approval number, including the digits after the decimal.
Escambia falls outside the High-Velocity Hurricane Zone, but its application still asks how the wind loads were determined.
For a set being filed in Escambia now, use the Florida Building Code, 8th Edition (2023), effective December 31, 2023. For December filings, the 9th Edition (2026) takes effect December 31, 2026.
Sources: [2] Open MGO Connect to apply or search for a permit; [7] Select Escambia County in MGO Connect; [3] Check county permit requirements by type of work; [8] Download the Escambia County building permit application and checklist; [17] Florida Building Commission materials on the hurricane zone boundary; [18] Florida Building Commission — current code; [19] Florida Building Commission — next code effective date; [24] MyGovernmentOnline customer guide — search by address
What will Escambia County charge?
For a project-specific price, start with the fee estimate forms on the county’s Plan Review page.
On the building form, enter the construction cost, type of improvement, footprint and total area under roof. Include a separate estimate request for each trade involved. Escambia’s forms cover building, electrical, mechanical, plumbing and gas fees. Ask the main office where to send the completed forms, since the Plan Review page and the building estimate PDF list different fax numbers.
The estimate covers Building Inspections charges only. The county determines the final amount when it finishes processing the application.
A fence land use certificate is an example of a separate charge. Planning and Zoning lists a $45 base fee, and its fence application shows $50 including the $5 technology fee.
Sources: [9] Request a building or trade fee estimate; [10] Building Permit Fee Estimate form; [23] County Planning and Zoning fee schedule; [22] Land Use Certificate for Fence Installation and site plan
When a commercial project needs site review
For proposed commercial development, take the parcel number and proposed use to Planning and Zoning at 850-595-3475.
The county offers a free pre-application meeting for commercial development and subdivisions. To arrange one, call 850-595-3984 or email [email protected]. Bring the proposed site layout to discuss zoning, future land use and floodplain questions before ordering building drawings.
For site development review under Land Development Code section 2-4.2, call the Development Review Committee coordinator at 850-595-3472 for an intake appointment.
The committee lists 11:30 a.m. Wednesday as the deadline for a complete site plan package. Development Review collects its fees at submittal. Once staff approve the site plan and issue the Development Order, Building Inspections can review the building plans. For a status check, use the site plan number with Development Review and the building permit number with Building Inspections.
Sources: [11] Escambia County Building Guide; [12] Development Review Committee filing deadline and appointments; [15] Escambia County Land Development Code
Flood maps and elevation paperwork
Open “Look Up a Property” on the county’s Flood Plain Management page to see the Flood Insurance Rate Maps effective August 19, 2025.
If the footprint crosses a zone boundary, ask about floodplain permits under section 4-2.5 of the Escambia County Land Development Code. On Pensacola Beach, see section 4-3.5 for the Santa Rosa Island Authority’s approvals and permits. Building Services takes floodplain and elevation certificate questions at 850-595-3550.
For a new building in a Special Flood Hazard Area, plan for three survey stages.
Send the pre-construction Elevation Certificate with the permit application, get the under-construction certificate to the county before the framing inspection, and deliver the finished-construction certificate before the final inspection. For insurance questions, identify the community as well as the zone. The county reports Class 6 for its unincorporated area under the Community Rating System. Pensacola and the Santa Rosa Island Authority participate separately.
Sources: [14] Look up the county flood map and reach floodplain staff; [15] Escambia County Land Development Code; [8] Download the Escambia County building permit application and checklist; [16] Community Rating System in Escambia County
From the recorded notice to final inspection
Escambia’s permitting instructions call for a certified copy of the recorded Notice of Commencement for work costing $5,000 or more, with a separate threshold of $15,000 or more for HVAC changeouts.
Where a notice is required, the county application directs you to record it with the Escambia County Clerk of the Court, deliver the recorded copy before inspections and post a copy at the site.
For a same-day inspection, registered users have until 6 a.m.
to schedule online. The automated phone line, 850-273-4864, has an earlier cutoff of 4:30 a.m. On a new home, keep the blower-door test certification on the closeout list. Escambia asks for it before issuing the Certificate of Occupancy. The county issues the applicable occupancy or completion certificate once construction is complete, the inspections have passed and any reinspection fees are paid.
Sources: [3] Check county permit requirements by type of work; [8] Download the Escambia County building permit application and checklist; [20] Request an Escambia County inspection; [11] Escambia County Building Guide
Drawings for an Escambia submittal
Pineland Engineering can prepare the site and building drawings for either side of Escambia’s Development Order process.
For a Pensacola Beach application, send the Santa Rosa Island Authority approval and the mapped flood zone with the proposed layout. Pineland can use them to coordinate the floor elevation on the building plans with the site grading and the location of equipment. If a county examiner has requested a change, include the comment and the sheet it refers to when requesting revisions.
Sources: [8] Download the Escambia County building permit application and checklist; [11] Escambia County Building Guide; [14] Look up the county flood map and reach floodplain staff
Free Florida Engineering Tools
Related Resources
What Do People Ask About Escambia County Building Services?
How do I look up an Escambia County building permit by address?
In MGO Connect, select Florida and Escambia County, then open Search Permits. Search by the project street address or the project number. If a Pensacola address returns no county record, check the Taxing Authority in the Property Appraiser’s record before searching under the city.
Do I need a permit for a fence in unincorporated Escambia County?
For an ordinary yard fence, the county directs you to Development Services for land use approval. Its fence certificate accepts a survey or a scaled site plan. Show the fence in relation to the house, property lines and bordering streets, and identify corner lots and easements on the form. For a pool barrier, tell the office that the fence will serve that purpose.
What size shed generally qualifies for Escambia County’s building permit exemption?
The county lists a portable, skid-mounted utility shed smaller than 120 square feet. If the shed sits on a poured slab or has a post set into the ground, the county requires a building permit at any size. Check its intended location with Planning and Zoning because setbacks and other land use rules can still apply.
How long does Escambia County building permit review take?
Ask Building Services for the current queue for your permit type. For a nonresidential building under 25,000 square feet using a local government plans reviewer, Florida Statutes § 553.792 sets a 60-business-day decision deadline after receipt of a complete and sufficient application, unless waived in writing. A decision can include conditions or a denial, and a stricter local deadline can apply. For a commercial site, allow separately for any Development Order before building review.
Can I file as an owner-builder in Escambia County or Pensacola?
For an owner-occupied home in the unincorporated county, ask Building Services about eligibility and supervision. Its storm-repair instructions direct eligible owner-builders to appear before a permitting technician and complete the Owner/Builder Disclosure Statement. Inside Pensacola city limits, the residential route is for owners who intend to live there for at least a year after completion. Execute the city’s Owner Builder Affidavit in person on the fifth floor of City Hall, 222 West Main Street, Monday through Friday, 7:30 a.m. to 12:30 p.m. Those are city affidavit hours.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.