Quick Answer
Call Jacksonville Building Inspection at 904-255-8500 or email [email protected]. Visit the second floor of the Ed Ball Building, 214 North Hogan Street, Jacksonville, FL 32202, Monday through Friday from 7:00 a.m. to 4:00 p.m. The office closes for most federal holidays. For online service, go to JaxEPICS.coj.net. Office and portal details checked November 23, 2026.
Jacksonville’s building department is the City of Jacksonville Building Inspection Division. Use the city’s JaxEPICS portal to file a permit, request an inspection or look up the result by address.
Where Can I Verify the Official Requirements?
- City of Jacksonville Building Inspection Division — office and contacts
- JaxEPICS — file a permit or look up an inspection
- Jacksonville JaxEPICS submission instructions
- Jacksonville building permit and plan review FAQs
- Jacksonville inspection instructions
- Jacksonville inspector contacts and route guidance
- Jacksonville permit fee schedule and siding permit rules
- City checklist for property owners applying for a shed permit
- Residential permits and site plan requirements
- Jacksonville commercial and residential permitting
- Jacksonville commercial permitting and jurisdiction
- Jacksonville Certificates of Use and Converting Use Building Permits
- Jacksonville private provider procedures
- FEMA Community Status Book — City of Jacksonville
- Jacksonville Floodplain Management and flood zone contacts
- Jacksonville flood zones and elevation certificates
- Jacksonville Land Development Procedures Manual, Volume 2
- Jacksonville window and door worksheet and wind ordinance
- Florida Building Commission materials defining the hurricane zone
- Florida Building Commission code effective date
- Florida Building Commission report on the upcoming code effective date
Which Duval office handles your address?
Jacksonville’s consolidated government issues permits within city limits.
For a property in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin, start with that municipality’s building and zoning staff. If you need help locating a Jacksonville lot on the zoning atlas, give Zoning its real estate number or legal description. Call 904-255-8300 for setbacks or permitted uses. For a driveway or work in the city right of way, the Development Services Review Group takes questions at 904-255-8310.
Sources: [11] Jacksonville commercial permitting and jurisdiction; [6] Jacksonville inspector contacts and route guidance
What to gather for a house, addition or commercial space
For a Jacksonville residential application, read the legal description on your deed before ordering a site plan.
If it describes the parcel by bearings and distances (metes and bounds), Zoning asks for a survey and a scaled plan showing building dimensions and distances to property lines. For a lot identified by lot and block, the scaled plan usually suffices, though Zoning may ask for a survey in an older subdivision. On residential plans, the city also reviews the building envelope for energy-code compliance.
Jacksonville’s owner-builder route requires the homeowner named on the deed to appear in person at Building Inspection.
It covers a primary residence for the owner’s own occupancy, with no sale or lease planned. Electrical, plumbing and mechanical contractors hired by an owner-builder obtain their own permits linked to the owner’s building permit.
For a new commercial building, check the parcel’s zoning before laying out parking and landscaping.
Jacksonville identifies site clearing, building, electrical, mechanical and plumbing as typical permits for new commercial projects. Before leasing an existing suite, ask Building Inspection to compare its last certified occupancy with your intended use.
Sources: [9] Residential permits and site plan requirements; [10] Jacksonville commercial and residential permitting; [4] Jacksonville building permit and plan review FAQs
How to submit plans and follow the review
Sign in to JaxEPICS and open the city’s online submission instructions for your permit type.
Complete Location, Contacts and Specs. Enter the email of the person who will receive review notices in Project Contact. Under Documents, upload the plans as PDFs, with architectural, structural and site sheets in their respective folders. Jacksonville’s instructions also call for the completed Permission to Obtain Permits form. Select “Submit For Review.” “Not Submitted” means the city has yet to receive the numbered application.
“DSD Review” can include zoning, landscape and drainage checks.
A location-specific approval, such as Historic or FEMA/Flood, may appear under “Agency Review.” Jacksonville starts its building plan review clock after the necessary zoning, concurrency and Development Services approvals and payment of the applicable review fee. The division’s FAQ gives an estimate of 25–30 business days for first review and about 10 business days or less for resubmissions. Ask your examiner for current timing.
“Return for Corrections” lets you edit the permitted fields and upload what the reviewer requests.
“Pending Payment” means reviews are complete and the balance is due. Look for “Active” to confirm issuance before scheduling the inspections on your permit.
Sources: [3] Jacksonville JaxEPICS submission instructions; [4] Jacksonville building permit and plan review FAQs
Find the fee row for your Jacksonville permit
Use the accessory-structure rows in the city fee schedule. For a residential accessory structure of 150 square feet or less costing $5,000 or less that needs no final inspection, the schedule lists $45 for the permit including plan review, $15 for Development Services and $25 for construction and demolition debris.
If the shed requires one inspection, the corresponding amounts are $75, $25 and $25. At 150 square feet, the shed checklist adds design drawings, product approval sheets and plan review. A shed costing $5,000 or more requires a recorded Notice of Commencement.
For a new building or addition, start with subsection (1) of the city fee schedule under § 320.409.
It prices enclosed floor area by story in increments of 100 square feet, counting a partial increment. Check the minimum fees and the separate trade permit fees before using the area calculation as a budget.
Sources: [7] Jacksonville permit fee schedule and siding permit rules; [8] City checklist for property owners applying for a shed permit
Schedule the inspection and prepare the site
Use Jacksonville’s inspection list issued to the permit holder.
The permit holder can schedule or cancel in JaxEPICS, or call 904-255-8500 and select option 4 to request an inspection during office hours. Put the lockbox code and the location of the approved plans in the request comments. At an occupied home or business, arrange for someone at least 18 years old to meet the inspector and give access to the work.
Post the permit on site and keep legible approved documents available in a weatherproof container.
When a recorded Notice of Commencement applies, post it too and send Building Inspection a copy marked with the permit number before requesting an inspection. Check the city’s daily inspector route for an approximate arrival time. For the outcome, search JaxEPICS using the permit number, confirmation number or address.
Sources: [5] Jacksonville inspection instructions; [6] Jacksonville inspector contacts and route guidance; [4] Jacksonville building permit and plan review FAQs
Flood and wind information for the site plan
FEMA’s Jacksonville record lists November 2, 2018 as the effective flood map date and gives the city a Community Rating System classification of 6.
For a parcel’s zone or an available elevation certificate, call Development Services at 904-255-7296. For construction in Zone AE, plan for an elevation certificate before the slab inspection and another before final inspection. Where a base flood elevation is established, the city’s manual calls for at least two feet above it, except for accessory structures covered by Ordinance Code § 652.1006.
For window or door replacement, Jacksonville’s worksheet draws the wind boundary in § 320.103 up the middle of the St.
Johns River from the south county line to the Fuller Warren Bridge, then north along Interstate 95. For Risk Category II, use 125 mph west of that line and 130 mph east on the worksheet. Duval lies outside the Florida Building Code’s High-Velocity Hurricane Zone. For Jacksonville permit applications today, the 8th Edition (2023) of the Florida Building Code applies, effective December 31, 2023. Jacksonville applicants approaching year-end should plan for the 9th Edition (2026), effective December 31, 2026.
Sources: [14] FEMA Community Status Book — City of Jacksonville; [15] Jacksonville Floodplain Management and flood zone contacts; [16] Jacksonville flood zones and elevation certificates; [17] Jacksonville Land Development Procedures Manual, Volume 2; [18] Jacksonville window and door worksheet and wind ordinance; [19] Florida Building Commission materials defining the hurricane zone; [20] Florida Building Commission code effective date; [21] Florida Building Commission report on the upcoming code effective date
Drawings for a Jacksonville tenant renovation
Pineland Engineering can prepare the life safety plan and code summary for a Jacksonville occupancy conversion and coordinate architectural and trade drawings for a buildout.
Send the suite address, its last approved use, the proposed use and the list of alterations. If the layout changes but the mechanical, electrical or plumbing systems stay as they are, Jacksonville asks for a clear note on the renovation plans identifying each unaffected trade.
Sources: [4] Jacksonville building permit and plan review FAQs; [12] Jacksonville Certificates of Use and Converting Use Building Permits
Free Florida Engineering Tools
Related Resources
What Do People Ask About City of Jacksonville Building Inspection Division?
Do I need a permit to build a shed in Jacksonville?
Yes. For an owner-filed storage shed, bring photo ID and a scalable certified survey to the permit appointment. Show all structures, distances from the shed to at least two adjacent property lines, any wells or septic system and the height to the roof peak. The city says sheds under 150 square feet and under $5,000 can be issued during the visit once all approvals are in. If your permit lists a slab inspection, schedule it before pouring concrete.
What home repairs require a permit in Jacksonville?
The division lists reroofing, garage conversions, water heater replacements and new electrical service as permit work. Its fee schedule also covers wood, vinyl, aluminum and cementitious siding replacement and stucco repairs over wood framing. For smaller plumbing jobs, the residential guide lists replacing a faucet downstream of the shutoff as exempt.
How do I look up a Jacksonville building permit or inspection?
JaxEPICS offers public permit lookup by address. For inspection results, search by street address, permit number or inspection confirmation number.
Does a new Jacksonville business need a change-of-occupancy permit?
Start with the Certificate of Use application in JaxEPICS. Under Jacksonville Ordinance Code § 656.151(a), a new business needs a Certificate of Use, reviewed by Zoning, Building Inspection and the Fire Marshal. If its use differs from the suite’s last certified occupancy classification, the converting-use permit must be final before the city approves the certificate. Even a conversion with no construction needs a life safety plan and code summary from a Florida-licensed design professional.
Who records inspections if I hire a private provider in Jacksonville?
The city requires the private provider firm to register and record inspection results through its company JaxEPICS profile. The property owner or the owner’s contractor is responsible for scheduling. For the permit package, use the city’s private provider checklist for the Notice to Building Official, owner authorizations and, when applicable, the Plan Compliance Affidavit.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.