City of Lake Mary Building Department

Pineland Engineering prepares permit-ready construction documents for Lake Mary, Florida projects and coordinates directly with the City of Lake Mary Building Department during plan review — so you get your permit faster.

Quick Answer

For a Lake Mary city permit, call the Building Division at 407-585-1366 or visit 911 Wallace Court, Lake Mary, FL 32746, Monday through Friday, 8 am to 5 pm. For an inspection, use Lake Mary Web Inspections or call 407-585-1441 by 2 pm for the next business day.

The City of Lake Mary Building Division reviews plans, issues permits and inspects work inside city limits. To file online, open the city’s Permit Portal below and select ePlan Review Portal. The same page has a video tutorial for applicants.

Where Can I Verify the Official Requirements?

Check the tax district before opening a permit file

Look up the property with the Seminole County Property Appraiser and read the tax district on the parcel record.

The city identifies its residents by the “Lake Mary” district and also publishes a corporate limits map. If the parcel is in unincorporated Seminole County, file with the county’s Building Division. A site inside Sanford goes to Sanford’s Building Division. Use the parcel record to settle that question even if the mailing address says Lake Mary.

For help choosing the city application, call a Lake Mary permit technician at 407-585-1361 or 407-585-1371.

The office address, hours, phone numbers and portal links here were checked against the city’s listings on November 23, 2026.

Sources: [13] City guidance on checking Lake Mary city limits; [14] Seminole County building permits; [15] City of Sanford Building Division; [12] Building Division directory and permitting contacts; [1] Apply online — Lake Mary Permit Portal and ePlan tutorial; [2] Contact the Lake Mary Building Division or search for permits

What to put in the Lake Mary application

Start with Building Permit Application under Applications & Forms.

Enter the site address and suite, parcel number, flood zone and cost of construction. In the description of work, identify the space and what you intend to change. Compare that description with the permit types on the next page. For example, Lake Mary lists commercial interior buildout and commercial electric separately. If the scope includes both, ask the permit technician which filings to open in ePlan. Lake Mary identifies the 2020 National Electrical Code for electrical work and the 8th Edition Florida Fire Prevention Code for fire review.

For a new single-family house, gather the site plan, building drawings, truss plans, energy calculations, window and door specifications, and soils report.

Lake Mary’s new-home checklist calls for a signed, notarized application and lists septic and arbor permits where applicable. Its contact for obtaining a new street address is Seminole County Addressing. If you are registering as a contractor, email your state license and proof of workers’ compensation and general liability insurance to [email protected]. Name the City of Lake Mary at 911 Wallace Court as the certificate holder.

The roofing entries on the application ask about the approved franchise container.

Lake Mary names Waste Pro as its solid-waste hauler. A construction contractor who wants to recycle can choose a city-approved recycling company. Check the container arrangement before completing the roofing entry.

For a tenant moving into a different use, identify what the suite was used for and what will happen there next.

Lake Mary’s application requires site plan approval before permit issuance for a residential or commercial change of use. If parking, utilities or allowable use could affect a lease decision, take a survey or a sketch to the city’s free First Step meeting. Staff can discuss those questions there. Formal site plan review is a separate step.

Sources: [4] Lake Mary Building applications and forms; [5] Lake Mary building permit application (PDF); [1] Apply online — Lake Mary Permit Portal and ePlan tutorial; [7] Lake Mary new single-family plan submittal requirements; [2] Contact the Lake Mary Building Division or search for permits; [16] Lake Mary First Step Process

Read the fee schedule for your scope

Lake Mary groups new construction, alterations, additions, pools and pool enclosures in one fee table.

It lists a nonrefundable application fee of 0.075% of documented construction value, with a $5 minimum. Plan review is 0.45% and nonrefundable. The permit fee is 0.75%, with a $35 minimum. The city’s new-home checklist says plan review is payable at application and lists a different submittal rate of 0.0005%, also with a $5 minimum. For a new house, ask Permitting which application charge it will collect.

The table also shows an inspection fee of 0.45% of construction value.

Florida Statutes § 553.79(1)(f) says inspection fees cannot be based on total project cost or exceed the agency’s actual inspection costs. Request an itemized inspection charge from the Wallace Court office before using the table to budget the job.

Sources: [6] Lake Mary fee table for new construction, alterations, additions and pools; [7] Lake Mary new single-family plan submittal requirements; [11] Florida Statutes § 553.79, inspection fees and residential exemptions; [12] Building Division directory and permitting contacts

Flood information to check before uploading plans

The Lake Mary application asks whether the development parcel lies in a Special Flood Hazard Area.

A yes answer calls for a floodplain determination with the application. Public Works handles floodplain questions at 407-585-1452. Give staff the parcel number and ask for the current map panel and any revisions affecting the proposed building location. The city’s flood guidance points applicants to Building Code § 150.06 for permits in the floodplain.

FEMA records September 28, 2007 as the effective date of Lake Mary’s Flood Insurance Rate Map and identifies the city as Class 5 in its Community Rating System.

For a property on the city’s Flood Elevation Certificates list, call 407-585-1453 to request the existing certificate. That record can help you discuss elevations with Public Works when preparing the parcel determination.

Sources: [5] Lake Mary building permit application (PDF); [19] Lake Mary Public Works flood guidance; [20] Lake Mary elevation certificate records; [21] FEMA Community Status Book record for Lake Mary

Request a city inspection and look up the result

Enter the permit number in Lake Mary Web Inspections to schedule a visit, change the appointment or retrieve the result.

Select the inspection for the stage of work. For an electrical permit, E203 is commercial rough electric, E204 is residential rough electric and E214 is final electric. If the work does not match a published inspection type, the city’s code list gives a separate number for help, 407-585-1362.

Use the 2 pm cutoff to plan the request. For example, for a Monday visit, submit by Friday at 2 pm when both days are regular city business days.

If all you have is an address and you need to find an earlier permit, start with Search for Permits on the Building Division page.

Sources: [3] Lake Mary Web Inspections — schedule, change or check an inspection; [17] Lake Mary inspection request codes; [18] Lake Mary electrical inspection codes; [2] Contact the Lake Mary Building Division or search for permits

Preparing drawings for Lake Mary review

For a new house, Pineland Engineering can coordinate the building drawings and energy calculations on Lake Mary’s submittal list.

Send the site plan and the window and door specifications together so the openings can be checked against the drawings. Lake Mary is in Seminole County, outside the High-Velocity Hurricane Zone reserved for Broward and Miami-Dade. Use the project’s own wind design criteria when selecting windows and doors.

For current Lake Mary applications, use the Florida Building Code 8th Edition (2023), in effect since December 31, 2023.

If you are preparing a set to file at year’s end, the published 9th Edition (2026) takes effect December 31, 2026. For a tenant buildout, send Pineland the existing suite layout and the proposed use along with any First Step feedback so the architectural and building systems drawings address the same scope.

Sources: [7] Lake Mary new single-family plan submittal requirements; [2] Contact the Lake Mary Building Division or search for permits; [21] FEMA Community Status Book record for Lake Mary; [25] Florida Building Commission docket filing explaining the HVHZ boundary (PDF); [22] Florida Building Commission current code effective date; [23] Florida Building Commission report on the upcoming code effective date (PDF); [24] Florida Building Commission links to both code editions; [5] Lake Mary building permit application (PDF); [16] Lake Mary First Step Process

What Do People Ask About City of Lake Mary Building Department?

Does a small backyard shed need a permit in Lake Mary?

Even a small tool shed goes through the city’s accessory-structure application process. Lake Mary Code § 154.14 calls for plans and a sketch showing the yard location, setbacks, height, use and share of the lot covered by impervious surfaces. A shed exempt from the Florida Building Code still needs city zoning approval before installation. For a shed under 400 square feet and under eight feet tall, the code sets a minimum four-foot setback. Have the city check the location on your sketch before ordering.

Can I request a permit exemption for a small home project?

Lake Mary accepts exemption requests for qualifying work under $7,500 at a single-family home. This exemption excludes electrical, plumbing, mechanical, gas and structural work, and properties that lie even partly in a flood hazard area. Upload the city’s Permit Exemption Request with documentation of the work and its total value. Wait for the Building Official’s approval before starting. The city lists a $35 administrative fee and directs you to keep the approved form on site.

How long does Lake Mary have to review an electrical permit?

For electrical work valued below $15,000 at an existing single-family home, Florida Statutes § 553.792 gives a local government reviewer five business days from a complete and sufficient application for a decision, unless the applicant waives the deadline in writing. The decision can be approval, approval with conditions or denial. For your filing, ask Lake Mary Permitting whether the application is complete, whether comments are outstanding and when to expect a decision.

Where do I send corrections to a Lake Mary permit application?

Under Applications & Forms, open the city’s online Response to Comments Form. Identify the reviewer’s comment and the sheet where the correction appears. Lake Mary lists a separate Revision Form on the same page. If you are changing the proposed scope, ask the permit technician which form to use.

Who handles a wind mitigation inspection for a Lake Mary home?

For an insurance inspection, ask your insurer about the Uniform Mitigation Verification Inspection Form. An authorized inspector completes it. If the inspector needs the permit history for the roof or windows, use Search for Permits on Lake Mary’s Building Division page. To check a city construction inspection on an active permit, enter its number in Web Inspections.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.