Jupiter Building Department

Pineland Engineering prepares permit-ready construction documents for Jupiter, Palm Beach County, Florida projects and coordinates directly with the Jupiter Building Department during plan review — so you get your permit faster.

Quick Answer

Visit the Jupiter permit counter Monday through Friday, 8 a.m. to 4 p.m. The office stays open until 5 p.m. on those days. For help filing a paper package, create a JCDS account before your visit and bring the paperwork to the counter for electronic submission.

The Town of Jupiter Building Department is at 210 Military Trail, Jupiter, FL 33458. Call 561-741-2286 or use the Jupiter Community Development System (JCDS) portal to apply for a building permit, read review comments or request an inspection.

Where Can I Verify the Official Requirements?

  1. Open JCDS to apply, check a permit or request an inspection
  2. Contact the Town of Jupiter Building Department
  3. Choose a Jupiter permit package
  4. Check Jupiter’s fee schedules and pay online
  5. Town instructions for online and counter filing
  6. Town FAQ on Jupiter mailing addresses and municipal boundaries
  7. Palm Beach County Permit Center for unincorporated addresses
  8. Jupiter Inlet Colony permit office and MGO portal
  9. Town of Jupiter Island Building Department
  10. JCDS building application guide
  11. Jupiter new house or duplex checklist
  12. Jupiter residential alteration and addition checklist
  13. Jupiter Building FAQ on windows, notices and veteran discounts
  14. Town of Jupiter schedule of building permit fees
  15. Jupiter flood maps and Elevation Certificate assistance
  16. Palm Beach County community flood rating table
  17. Jupiter Natural Resources FAQ for docks, lifts and seawalls
  18. Town dock survey and permit checklist
  19. Apply for a Jupiter engineering permit
  20. Engineering and Utilities Permit submittal requirements
  21. Florida Building Commission definition of the High-Velocity Hurricane Zone
  22. Florida Building Commission current code effective date
  23. Florida Building Commission code transition date
  24. Request a building inspection in JCDS
  25. Florida Statutes § 553.792 on application decisions
  26. Town instructions for finding permits by date and address
  27. Search the Town Clerk’s older permit records
  28. Apply to Jupiter’s Construction Board of Adjustments and Appeals
  29. Jupiter list of work exempt from a building permit
  30. Jupiter shed and storage building package
  31. Jupiter monthly and fiscal-year permit reports

Does the Military Trail office serve your address?

Jupiter Farms and Jonathan’s Landing both have Jupiter mailing addresses but fall in unincorporated Palm Beach County.

For either community, start with the County Permit Center’s ePZB portal. Jupiter Inlet Colony uses My Government Online for new building permits. If the property is in the Town of Jupiter Island, contact that town’s Building Department.

For application questions, email [email protected] with the property address and any JCDS permit number. Office details and portal checked November 23, 2026.

Sources: [1] Open JCDS to apply, check a permit or request an inspection; [2] Contact the Town of Jupiter Building Department; [6] Town FAQ on Jupiter mailing addresses and municipal boundaries; [7] Palm Beach County Permit Center for unincorporated addresses; [8] Jupiter Inlet Colony permit office and MGO portal; [9] Town of Jupiter Island Building Department

Choose the application before uploading drawings

In JCDS, open Apply, choose Permits and search by the name of the work.

For a new house, look for Residential New Single-Family Dwelling/Duplex. For a room that adds square footage, choose Residential Addition. Jupiter’s addition checklist asks for the original and proposed floor plans with finished-floor elevation.

Select Add Location and search for the address or parcel. Check the permit type here.

If it is wrong, restart the application. Add the owner and contractor under Contacts. In Attachments, follow the file names in Helpful Links and upload each PDF under its checklist category. For a new house, these include Survey, Building Plans, Supporting Docs and NOA for product approvals. Review the summary, select Submit, then choose Continue to permit for your permit number.

Jupiter asks for a certified, recorded Notice of Commencement for a project valued at $5,000.01 or more.

For a contract to repair or replace heating or air conditioning, its threshold is a value over $14,999.99. If the notice is ready after you file, send it to [email protected].

Sources: [3] Choose a Jupiter permit package; [10] JCDS building application guide; [11] Jupiter new house or duplex checklist; [12] Jupiter residential alteration and addition checklist; [13] Jupiter Building FAQ on windows, notices and veteran discounts

What Jupiter charges and when to pay

Jupiter’s building permit schedule sets the fee at 2% of the work value, with a $75 minimum.

At application, 30% of the permit fee is due. For a new house or duplex, the balance, including applicable impact fees, is due at issuance. Keep the contract for valuation. The Town’s Fees page links to credit card payment and impact fee schedules. The issuance date determines which schedule applies. For projects subject to a fire impact fee, use the Jupiter Fire Rescue rate effective October 1, 2026.

Jupiter offers homesteaded, honorably discharged veterans a 50% building permit fee discount, capped at $250.

To apply, the veteran homeowner and contractor go to the Military Trail counter together. Bring the DD214 discharge document.

Sources: [14] Town of Jupiter schedule of building permit fees; [4] Check Jupiter’s fee schedules and pay online; [11] Jupiter new house or duplex checklist; [2] Contact the Town of Jupiter Building Department; [13] Jupiter Building FAQ on windows, notices and veteran discounts

Prepare the house, dock and site plans for a waterfront lot

For a home on the Loxahatchee River or a canal, look up the street address on the flood map effective December 20, 2024.

Palm Beach County’s community rating table lists Jupiter as Class 5. For the flood zone of the individual lot or an Elevation Certificate on file, give the address to Jupiter’s Building Department. Its new-house package calls for a floodplain development permit when the site is in a flood hazard area. Show the proposed floor elevation and FEMA base flood elevation on the survey, and mark flow directions on the lot drainage plan.

When the plans include a dock, select Marine Structure in JCDS.

Under Town Code section 27-2626, the dock checklist calls for a survey dated within six months of application. Ask the surveyor to mark the mean high water line, the width of the waterway at the dock and the distances from the dock and mooring spaces to the side property lines. If the scope includes a seawall, arrange a meeting with Natural Resources and Planning before choosing a replacement. The shoreline options depend on whether the existing structure is a bulkhead or a revetment.

For site development that needs an Engineering and Utilities Permit, open Engineering’s Permit Process page.

It links to the engineering checklist, fees and final document package. The engineering review calls for a boundary or topographic survey showing easements and other encumbrances, and drainage calculations where applicable. The Town must approve the submittal before issuing the engineering permit.

Sources: [11] Jupiter new house or duplex checklist; [15] Jupiter flood maps and Elevation Certificate assistance; [16] Palm Beach County community flood rating table; [17] Jupiter Natural Resources FAQ for docks, lifts and seawalls; [18] Town dock survey and permit checklist; [19] Apply for a Jupiter engineering permit; [20] Engineering and Utilities Permit submittal requirements

Match window selections and drawings to the Jupiter application

Jupiter is outside Florida’s High-Velocity Hurricane Zone, which covers Miami-Dade and Broward counties.

On the Town’s new-house checklist, the elevation drawings still need design pressures for each opening. Match each proposed window or door to its product number and mark the applicable installation details, including anchors and pressures. Include the Florida energy efficiency calculations in Supporting Docs.

Current Jupiter applications use the Florida Building Code, 8th Edition (2023), effective December 31, 2023.

The state’s 9th Edition (2026) takes effect December 31, 2026. If you are selecting products for a year-end filing, give the designer the intended JCDS application date.

Sources: [11] Jupiter new house or duplex checklist; [21] Florida Building Commission definition of the High-Velocity Hurricane Zone; [22] Florida Building Commission current code effective date; [23] Florida Building Commission code transition date

Request the inspection and prepare for the site visit

Open the permit number on the JCDS dashboard and select Inspections.

Check the action box for the inspection you need and select Request Inspection. If the boxes are missing, check for unpaid fees. Choose a date, add site comments and enter the contact’s name and phone. A green check on the Requested Inspections screen confirms that JCDS received the request.

For a new house or duplex, send the form-board survey showing the finished-floor elevation before concrete placement.

Give the inspector the final as-built drainage plan at final inspection. Under Jupiter Town Code section 13-114, ordinary construction hours are 7 a.m. to 8 p.m. Monday through Friday and 8 a.m. to 4 p.m. Saturday. Contact the Town Manager’s office for permission to work outside those hours.

Sources: [24] Request a building inspection in JCDS; [5] Town instructions for online and counter filing; [11] Jupiter new house or duplex checklist; [2] Contact the Town of Jupiter Building Department

Where Pineland’s drawings fit in the JCDS package

For a Jupiter house addition, Pineland Engineering can prepare the floor plans showing the change in footprint and coordinate the structural and building systems drawings with them.

For a waterfront lot, share the survey, the proposed floor height and any JCDS drainage comments. Pineland can use those to coordinate the house drawings with the grading plan so the elevations agree across the two submissions.

Sources: [11] Jupiter new house or duplex checklist; [12] Jupiter residential alteration and addition checklist; [20] Engineering and Utilities Permit submittal requirements

What Do People Ask About Jupiter Building Department?

How long does Jupiter building permit review take?

For a new single-family house under 7,500 square feet reviewed by Town plans staff, Florida Statutes § 553.792 generally gives the Town 30 business days from a complete and sufficient application to approve, approve with conditions or deny it, unless the applicant waives the timeframe in writing. For the current estimate on your own submittal, call 561-741-2286 with the JCDS permit number and ask about outstanding comments.

What home improvements need a Jupiter permit?

Even replacing one window or exterior door needs a permit in Jupiter. For a one- or two-family dwelling, the Town exempts cabinet and countertop replacements that keep the layout and involve no electrical or plumbing work. If a kitchen project includes moving the sink, describe that change to the counter when selecting the package.

What size shed is exempt from a Jupiter building permit?

Jupiter’s exemption covers a detached, one-story tool or storage shed with no more than 120 square feet of floor area. Zoning approval may still apply. If yours falls outside the exemption, use the Town’s Sheds/Storage Building checklist to locate it on the survey and show its setbacks.

Where can I look up past Jupiter permits?

For documents from October 1, 2015 onward, search the street address in JCDS. For earlier permits or plans, enter the property’s exact address in the Jupiter Online Records Search Portal. If the record is missing, use JupConnect to request it. For a list of permits issued across town, use Building Reports and choose the month or fiscal year.

Which permits should I check for a new waterfront home in Jupiter?

Start with the new-house permit and check the flood hazard area on the Town map. Jupiter also calls for electrical, mechanical, plumbing and roofing permits before those trades start. A dock or boatlift needs a building permit. For that marine application, include any applicable state, Army Corps and homeowners association authorizations.

Who handles a formal appeal of a Jupiter building decision?

Use the Town’s application to appear before the Construction Board of Adjustments and Appeals. Identify the property, the decision and the code section at issue. The form directs the petitioner to provide written support at least one week before the hearing. Confirm the filing fee with the counter because the form and fee schedule list different amounts.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.