The St. Lucie County Building & Code Compliance is the Authority Having Jurisdiction (AHJ) for building permits and inspections in St. Lucie County, Florida. Before work begins, confirm the applicable jurisdiction, permit type, and current submittal requirements with the department. Where Florida law requires a licensed design professional, the plans need to come from a Florida-licensed engineer or architect. Pineland Engineering prepares complete permit packages for projects throughout St. Lucie County, Florida and supports clients through plan review.
Contact Information & Office Hours
St. Lucie County Building & Code Compliance Address: 2300 Virginia Ave, Fort Pierce, FL 34982 Phone: (772) 462-2186 Email: [email protected] Website: https://www.stlucieco.gov/building Building Official: Mark Thornbloom
Office Hours: Monday–Friday 8:00 AM – 5:00 PM
St. Lucie County Building & Code Compliance handles permits and inspections for unincorporated St. Lucie County. The cities of Port St. Lucie and Fort Pierce have their own building departments.
St. Lucie County Permit Requirements & Wind Zone
The Risk Category II range across St. Lucie County is about 149–164 mph under ASCE 7-22.
The county includes coastal areas along the Atlantic Ocean and the Indian River Lagoon, with significant FEMA flood zone coverage in low-lying and coastal areas.
Common permit types in St. Lucie County:
Residential new construction and additions
Commercial construction and renovations
Roofing permits (wind-rated products required)
Screen enclosures and pool cages
Dock and seawall permits (coastal properties)
Electrical, plumbing, and mechanical permits
Check the county checklist for your permit type to see which plans to submit.
Permit Fees in St. Lucie County
St. Lucie County Building & Code Compliance calculates permit fees based on construction valuation. General reference:
Minimum permit fee: $75
Plan review fee: approximately 25–30% of the permit fee
State surcharge: 1.5% of the permit fee
Impact fees: apply to new construction (contact the county for current rates)
Fees are subject to change. Contact St. Lucie County Building & Code Compliance or use Pineland Engineering's Florida Permit Fee Estimator for a current estimate.
Engineering Services for St. Lucie County Projects
Pineland Engineering prepares complete permit packages for St.
Lucie County projects. We serve homeowners, contractors, and developers throughout the Treasure Coast with structural engineering, architectural design, coastal flood zone compliance, and MEP engineering services.
Call (239) 420-1530 or submit a quote request to get started.
Free Florida Engineering Tools
Related Resources
What Do People Ask About St. Lucie County Building & Code Compliance?
What permits does the St. Lucie County Building & Code Compliance require for a home addition?
A home addition in St. Lucie County, Florida requires a building permit from the St. Lucie County Building & Code Compliance. Include plans showing the proposed work, any required structural calculations and the supporting documents listed for your permit type. Contact the St. Lucie County Building & Code Compliance at (772) 462-2186 for specific requirements.
How long does permit review take at the St. Lucie County Building & Code Compliance?
Permit review times at the St. Lucie County Building & Code Compliance vary by project type and current workload. Residential remodels typically take 2–6 weeks; new construction and commercial projects may take 4–12 weeks. Pineland Engineering can advise on current review times and help expedite the process.
Does Pineland Engineering prepare permit drawings for St. Lucie County, Florida?
Yes. Pineland Engineering prepares complete permit sets for residential and commercial projects in St. Lucie County, Florida. We handle structural engineering, architectural drawings, energy code compliance, and coordination with the St. Lucie County Building & Code Compliance. Call (239) 420-1530 for a free assessment.
What is required for a change of occupancy in St. Lucie County, Florida?
A change of occupancy in St. Lucie County, Florida requires a permit from the St. Lucie County Building & Code Compliance and a full plan review. Requirements include updated architectural drawings, structural analysis, life safety review, accessibility compliance, and energy code documentation. Pineland Engineering prepares change of occupancy permit packages for St. Lucie County, Florida projects.
Are engineering drawings required for permits in St. Lucie County, Florida?
It depends on the work. Florida law determines when plans must come from a licensed engineer or architect. Pineland Engineering prepares permit drawings for projects in St. Lucie County, Florida.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.