Hialeah Gardens Building Department

Pineland Engineering prepares permit-ready construction documents for Hialeah Gardens, Miami-Dade County, Florida projects and coordinates directly with the Hialeah Gardens Building Department during plan review — so you get your permit faster.

Quick Answer

Call (305) 558-4114 ext. 221 for an appointment with the Hialeah Gardens Building Official or an inspector. The office is open weekdays from 8:00 a.m. to 5:00 p.m. Pick up the application at the counter or download the city packet below. Contact details and hours checked November 23, 2026.

The City of Hialeah Gardens Building Department issues permits for new construction and renovations at 10001 N.W. 87th Avenue, Hialeah Gardens, FL 33016, next to City Hall. Bring permit applications Monday through Friday between 8:00 a.m. and 4:30 p.m.

Where Can I Verify the Official Requirements?

Check the first two digits of the property folio

Look up the job address in the Miami-Dade Property Appraiser’s Property Search and read the beginning of the folio number.

A folio starting with 27 identifies Hialeah Gardens. A prefix of 04 identifies the City of Hialeah, which has its own building official. A prefix of 30 sends you to Miami-Dade County for an unincorporated property. This check is especially useful if a contractor has given you a City of Hialeah application for a Hialeah Gardens address.

Sources: [5] Miami-Dade Property Appraiser — look up a folio and its municipal code; [7] County Municipal Approval — required documents and tracking instructions

What to bring to the Hialeah Gardens counter

Start with the city’s Building Permit Application. The ownership checklist lists a warranty deed, closing statement, tax bill and notarized consent from the owner.

The owner must sign the application, and the city calls for notarization of all application signatures. Check the date on any survey you plan to submit. The city asks for a certified survey less than six months old.

Hialeah Gardens lists a Home Owner Association Affidavit for all permits.

If the property has an association, also get its approval letter describing the work it allows. For example, if you intend to fence a townhouse yard, compare the proposed fence on your survey with the scope in the association’s letter before submitting both.

For contractors, the city lists proof of county and state licensing and registration, an original insurance certificate addressed to the City of Hialeah Gardens with its expiration date, and a $25.00 nonrefundable annual administration fee.

Ask the counter for the project’s permit fees separately. The city also requests receipts for applicable impact fees, including road, fire, and water and sewer charges.

Ask about the certified Notice of Commencement when you give the counter your estimated job cost.

The city’s Permit Requirements and Application Information pages give different dollar thresholds for submitting the copy before permit issuance. Confirm which instructions apply to your job before you schedule pickup.

Sources: [2] Download the Hialeah Gardens building permit application and project checklists; [6] City checklist for residential and commercial permits; [8] City application information

When Miami-Dade reviews the plans first

For commercial buildings, apartment buildings and townhouse projects, Hialeah Gardens requires Miami-Dade Fire and environmental review (DERM) approvals before the city processes the permit.

Start by asking the city for the process number to use on the county filing. Miami-Dade asks for a copy of the city application with its process number, the county Application for Municipal Permit, a completed Contact Sheet and the plans.

For an online filing, open Miami-Dade’s Plan Status and Application Submittal Portal and choose Building Permits for this municipal review, including the DERM portion.

The county also takes applications in person and charges to convert paper plans to electronic files. Keep the county’s M-number alongside the Hialeah Gardens process number. To read county review comments, open the M-number in the portal’s Applications box and select D or P. Contact the city counter for the status and current review time of the city permit.

Sources: [3] Miami-Dade Plan Status and Application Submittal Portal — county approvals; [6] City checklist for residential and commercial permits; [7] County Municipal Approval — required documents and tracking instructions

What to put on the drawings

For window or door replacement, the Hialeah Gardens packet asks for product control numbers, including the numbers for mullions, and the wind pressures.

Hialeah Gardens falls in Miami-Dade’s High Velocity Hurricane Zone. Before ordering a window assembly, compare the number and pressure shown for that opening with the installer’s proposed product.

For new construction the city checklist includes window and door schedules, a framing plan, cooling equipment specifications and energy calculations.

For a Hialeah Gardens permit filed now, prepare those schedules and calculations under the Florida Building Code, 8th Edition (2023), effective December 31, 2023. If you plan to file at year-end, tell the designer the expected submission date because the 9th Edition (2026) takes effect December 31, 2026.

Sources: [2] Download the Hialeah Gardens building permit application and project checklists; [10] Florida Building Commission — High Velocity Hurricane Zone; [11] Florida Building Commission — current code effective date; [12] Florida Building Commission — next code effective date

Grading, paving and the flood map at City Hall

The Hialeah Gardens permit packet routes paving to Public Works for review and a permit.

Show drainage details and elevations with the site plan. If the proposal includes fill, the packet points to Chapter 58, Ordinance 93-12, for the survey and lists a Public Works permit. Mark both paving and fill on your sketch when asking Public Works what the application should include.

For a project where elevation matters, take the property address to FEMA’s Flood Map Service Center.

Miami-Dade lists September 11, 2009 as the effective date of its current flood maps. FEMA’s final determination lists Hialeah Gardens City Hall as the local place to view the new map, effective February 19, 2027. If design and filing fall on opposite sides of that date, bring the parcel’s map panel and the proposed grading to the Hialeah Gardens Public Works Director, the floodplain contact in the county directory.

Sources: [2] Download the Hialeah Gardens building permit application and project checklists; [13] Miami-Dade flood maps and municipal floodplain managers; [14] FEMA final map determination and local map repository; [15] FEMA Flood Map Service Center — search by address

Schedule the inspection for the right trade

Call (305) 558-4114 or (305) 558-3862 before 3:00 p.m. the day before the inspection.

Hialeah Gardens schedules building and roofing inspections Monday through Friday from 10:00 a.m. to 3:00 p.m. If you need to cancel one of those visits, call before 9:00 a.m. on the inspection day.

Mechanical and plumbing inspectors visit on Tuesdays and Thursdays.

Electrical inspections run Tuesday through Thursday. For any of those three trades, call again on the morning of the scheduled inspection to get a time frame. For example, if you need plumbing and electrical inspections on the same day, ask for Tuesday or Thursday when you call.

For a certificate of occupancy or completion, or the final inspection on an addition, use the city’s final-document checklist.

It calls for the applicable trade approvals, including fire, on the permit card or construction log. Check whether your project also needs the final survey with elevations and a final elevation certificate. Bring the applicable documents to the office for review before collecting the certificate.

Sources: [4] Hialeah Gardens inspection schedule and phone lines; [9] City checklist for final inspection, occupancy or completion

Drawings Pineland can prepare for city review

For a Hialeah Gardens addition, the city’s checklist puts the survey and site plan alongside floor plans, sections, elevations and structural calculations.

Pineland Engineering can use the survey to locate the addition on the site plan and coordinate its framing details with the floor plan. If new paving changes how water drains, Pineland can also prepare the civil drawings showing elevations and drainage for Public Works.

Sources: [2] Download the Hialeah Gardens building permit application and project checklists

What Do People Ask About Hialeah Gardens Building Department?

Can I apply online for a Hialeah Gardens building permit?

Download the application from the city and call ext. 221 about electronic delivery for your scope. The city publishes weekday counter intake hours. Miami-Dade’s online Building Permits option handles required county reviews of municipal projects.

Do I need a permit for a fence in Hialeah Gardens?

The city lists fences and walls in its permit packet for Building and Zoning review. It asks for a survey, plans, scaled construction details, release letters from all utilities and a notarized hold harmless letter from the owner addressed to the city. Gather the utility letters while the fence details are being drawn.

Do backyard pavers go through the Building Department?

Hialeah Gardens lists paving under Public Works. Take a sketch showing the area to be paved and where runoff will go. Ask Public Works how to show your backyard layout on the site plan and which elevations it needs.

How long does it take to change the architect or engineer on a Hialeah Gardens permit?

The city’s change-of-professional form gives an estimate of 7 to 10 business days for that change. Only the owner can submit the form and must sign it. It goes to the Building Official for approval. For initial plan review, request a current estimate from the building counter.

Do I still call for a city inspection if my Hialeah Gardens project has a special inspector?

Yes. The city’s special inspector form calls for scheduling mandatory city inspections as well. The special inspector keeps a log for each building where the city inspector can consult it on site and hands in the completed log at the final inspection.

How do I find open permits on a Hialeah Gardens property?

Use the City Clerk’s Lien and Open Permit Search instructions. The clerk directs applicants to Lien Library, where you enter the property address, pay online and track the request in your account. The city lists a $325 flat fee for the lien and permit search. The report includes open and expired permits.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.