Quick Answer
Call the Town of Golden Beach Building and Zoning office at 305-932-0744 ext. 234. Town Hall is at 100 Ocean Boulevard, Golden Beach, FL 33160. Use the Town’s Online Permit Application for work listed in its online manual, or book a permit drop-off appointment for plans that need counter review.
Golden Beach Building and Zoning issues permits for properties inside the Town, between Sunny Isles Beach to the south and Hallandale Beach to the north. Near either boundary, check the municipality in the Miami-Dade property record before booking.
Where Can I Verify the Official Requirements?
- Contact Golden Beach Building and Zoning
- Apply online for a Golden Beach permit
- Book a permit drop-off appointment
- Request a Town inspection
- Choose an application or permit form
- Read the adopted fee amendment and Exhibit A
- Search the Council packet for the Exhibit A fee table
- Online permit types and upload instructions
- How the permit clerk handles plans
- Town deadlines after approval and issuance
- Golden Beach municipal boundaries
- Miami-Dade County permit jurisdiction
- Current Golden Beach owner-builder package
- Florida Legislature — owner-builder exemption and disclosure
- Building Regulatory Advisory Board application and deadlines
- New construction, addition and remodel documentation log
- Permit submittal and corrections checklist
- Demolition checklist and Town Code § 50-11
- Florida Building Commission — hurricane zone definition
- Florida Building Commission — current code
- Florida Building Commission — next edition effective date
- Miami-Dade County — effective flood maps
- FEMA — final flood map date and Golden Beach map repository
- FEMA — community ratings effective April 2025
- Golden Beach oceanfront floodplain forms
- Golden Beach Certificate of Occupancy requirements
- Town record of the amended building permit fee schedule
When to call or visit Town Hall
Monday through Thursday, Building and Zoning opens at 8:30 a.m., closes at noon and reopens from 1:30 to 3:30 p.m.
Friday hours are 8:30 a.m. to noon. The office closes on weekends and posts holiday closures on the department page. Office details and filing links checked November 23, 2026.
On the Town’s Schedule Appointment calendar, book one slot per permit submission.
Look for your name under the time you chose. There is no automatic confirmation email. Arrange meetings with department staff directly.
Sources: [1] Contact Golden Beach Building and Zoning; [3] Book a permit drop-off appointment; [2] Apply online for a Golden Beach permit; [11] Golden Beach municipal boundaries; [12] Miami-Dade County permit jurisdiction
How to file through the portal or at the counter
Start with the project folio from the Miami-Dade County Property Appraiser.
Contractors filing online should check that their Golden Beach registration is current. Choose the permit type in the online manual, then upload the completed application, the signed owner–contractor agreement and the documents listed for that work. For a kitchen or bathroom remodel on the online list, include a survey and an 11-by-17-inch elevation drawing locating the plumbing, electrical and mechanical work.
The Town emails the first invoice and sends the application to a plans examiner after payment.
Check the same inbox for corrections or a final invoice. The approved permit arrives by email once final payment posts.
For a counter filing, the contractor gives the plans to the clerk and pays the upfront fees.
The Town calls with the review decision. If corrections are requested, pick up the plans and return the revised set with a narrative explaining what changed. For an approved set, pay the balance and collect the permit.
Sources: [2] Apply online for a Golden Beach permit; [5] Choose an application or permit form; [8] Online permit types and upload instructions; [9] How the permit clerk handles plans; [17] Permit submittal and corrections checklist
When a homeowner acts as the contractor
Choose the Owner-Builder Permit package on the Town’s forms page if you intend to supervise work on your own home.
The packet includes the application and the owner’s affidavit. Match your name and the legal description on the application to the ownership record. A recorded deed is one accepted proof. List the subcontractors who will work on the property before the Town issues the permit.
For a homeowner building a residence for personal use under Florida’s owner-builder exemption, the owner directly supervises work that licensed contractors do not perform.
Review the packet’s separate electrical, mechanical, plumbing and roofing permit instructions before dividing the work. If you plan to hire workers directly, read the state owner-builder disclosure on payroll withholding and workers’ compensation before hiring them.
Sources: [13] Current Golden Beach owner-builder package; [14] Florida Legislature — owner-builder exemption and disclosure; [5] Choose an application or permit form
What Golden Beach charges for a small permit
Look up both the review charge and the permit fee in Exhibit A to Resolution 3103.26, the Town’s amended fee schedule for fiscal year 2026–27.
For a stand-alone building permit in the small installation, minor repair and maintenance category, the building review line is $150 and covers two reviews. Electrical review in that category is $100 for two reviews.
The flat building permit fee shown for that category is $600, which includes $100 for administration and a $500 permit charge.
Ask the permit clerk which category and trades apply to your scope before budgeting. Keep the review charge separate from the cost of issuance.
Sources: [6] Read the adopted fee amendment and Exhibit A; [7] Search the Council packet for the Exhibit A fee table; [27] Town record of the amended building permit fee schedule
Board review for an addition or exterior change
For a new residence, an addition, an exterior alteration or an extra structure on an existing home site, start with the Town’s Building Regulatory Advisory Board packet.
Prepare the survey, warranty deed and drawings with a breakdown of the floor area. Assemble the landscape submission separately with the existing landscape and tree survey, the Town’s Landscape Legend and the proposed site plan.
The packet puts the first zoning, civil and applicable landscape review within the first week after submission.
Check the board calendar for your filing deadline. The packet calls for a satisfactory review within the eight days before the meeting. The Community Development Memorandum clears the proposal for possible board approval. Keep the board approval for the master permit application. The Town’s construction checklist also calls for energy calculations and grading and drainage calculations on its own form.
Sources: [15] Building Regulatory Advisory Board application and deadlines; [1] Contact Golden Beach Building and Zoning; [16] New construction, addition and remodel documentation log
Site demolition and the restoration bond
Before applying for a Golden Beach demolition permit, line up the sewer capping, temporary perimeter fence, erosion and sediment controls, and portable toilet.
The Town’s demolition package calls for inspection tickets for those preliminary permits. Collect the utility disconnect letters while preparing the documentation log, demolition plan and plan for regrading and replanting the lot.
Town Code § 50-11 requires a demolition permit even for removal of part of a structure.
The cash performance bond is 150 percent of the estimated cost of carrying out the regrading and revegetation plan. For a main structure, the Town’s online manual lists demolition among the applications it accepts with the completed log, letters and restoration plan.
Sources: [18] Demolition checklist and Town Code § 50-11; [8] Online permit types and upload instructions
Wind and flood documents for a Golden Beach lot
Golden Beach’s location in Miami-Dade puts its window and exterior door replacements in the High-Velocity Hurricane Zone.
Use the Town’s window and door handout alongside the submittal checklist, which calls for the full product approval sheets. For an application filed now, use the Florida Building Code, 8th Edition (2023). For a filing near year-end, account for the change to the 9th Edition (2026) on December 31, 2026.
Before setting floor elevations, take your survey to the Building Department at 100 Ocean Boulevard, the map repository FEMA lists for Golden Beach.
The map in effect is dated September 11, 2009, and FEMA’s revised map takes effect February 19, 2027. Ask which panel applies on your filing date. For an oceanfront property, the Town’s Zone 1 floodplain page includes a non-conversion agreement. FEMA’s April 2025 Community Rating System table lists Golden Beach in Class 10.
Sources: [5] Choose an application or permit form; [17] Permit submittal and corrections checklist; [19] Florida Building Commission — hurricane zone definition; [20] Florida Building Commission — current code; [21] Florida Building Commission — next edition effective date; [22] Miami-Dade County — effective flood maps; [23] FEMA — final flood map date and Golden Beach map repository; [24] FEMA — community ratings effective April 2025; [25] Golden Beach oceanfront floodplain forms
Requesting inspections and closing out the permit
Use Schedule Inspection on the Town website by noon the day before the requested visit.
The posted Tuesday and Thursday windows are 11 a.m. to 3 p.m. for building, 10 a.m. to 1 p.m. for electrical and 10 a.m. to 3 p.m. for plumbing. Mechanical inspections also run Tuesdays and Thursdays, with the time set by the inspector. Contact the landscape inspector directly for a time.
Golden Beach’s published procedures give the contractor 60 days after approval to pay for and pick up the permit.
They direct the contractor to begin work within 180 days of issuance and to schedule inspections no more than 180 days apart once work starts. For a new home or addition, obtain the Certificate of Occupancy before moving in. The Town checks that final inspections have passed, including landscape and irrigation, and asks for a completed FEMA Elevation Certificate.
Sources: [4] Request a Town inspection; [1] Contact Golden Beach Building and Zoning; [10] Town deadlines after approval and issuance; [26] Golden Beach Certificate of Occupancy requirements
Preparing drawings for the Town’s board and permit reviewers
For a Golden Beach addition, bring Pineland Engineering the survey and the board’s exterior design comments.
Pineland can coordinate the area tally on the architectural plans with the footprint used for the grading and drainage calculations. If plumbing or mechanical equipment moves, identify the new locations on the drawings before returning a correction to the Town.
Sources: [15] Building Regulatory Advisory Board application and deadlines; [16] New construction, addition and remodel documentation log
Free Florida Engineering Tools
Related Resources
- Drawings for a permit application
- Architectural design for a home addition
- Coastal and flood-zone design
- Florida impact window and door guide
- Hallandale Beach Building Department
- Miami Lakes permit requirements and submittal steps
- South Miami permit requirements and submittal steps
- Bay Harbor Islands permit requirements and submittal steps
- Hialeah Gardens permit requirements and submittal steps
- Opa-locka permit requirements and submittal steps
- Aventura permit requirements and submittal steps
- Biscayne Park permit requirements and submittal steps
- Surfside permit requirements and submittal steps
- Palmetto Bay permit requirements and submittal steps
- North Bay Village permit requirements and submittal steps
What Do People Ask About Golden Beach Building Department?
What number do I call about a Golden Beach building permit?
Call 305-932-0744 ext. 234 for Building and Zoning. If you need to drop off plans, reserve a slot on the Town’s permit appointment calendar.
How much does a building permit cost in Golden Beach?
For stand-alone small installations, minor repairs and maintenance, Exhibit A lists a $600 flat building permit fee and a separate $150 building review line. Ask the Town to identify the applicable trades and review charges for your project.
How long does Golden Beach take to review an addition?
The advisory board packet schedules an initial staff review during the first week after submission. A meeting date depends on clearing comments and meeting the agenda deadline. Ask Building and Zoning for the current permit review time for your addition.
What size shed can I put in a Golden Beach yard?
Before buying a shed, give Building and Zoning its dimensions and proposed location on your survey. The board packet lists additional structures on residential lots for approval. Ask whether your shed is allowed at that location and which form to file.
What does the Town need for a front door replacement?
The online manual lists an 11-by-17-inch elevation drawing showing wind pressures and a copy of the Notice of Acceptance for the front door. The Town publishes a separate window and door handout on the permit forms page.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.